Efficiency Analysis of the Combination of Heavy Equipment Use in Excavation and Landfill Work in Road Construction Projects

Authors

  • Usman Hadianto Universitas Pembangunan Nasional “Veteran” Jawa Timur
  • I Nyoman Dita Pahang Putra Universitas Pembangunan Nasional “Veteran” Jawa Timur https://orcid.org/0000-0002-5759-049X

DOI:

https://doi.org/10.47134/pslse.v2i3.438

Keywords:

Heavy Equipment, Productivity, Idle Time, Efficiency, Combination

Abstract

An efficient heavy equipment management system is needed to complete a earthwork on time. This study aims to analyze the productivity and efficiency of the combination of heavy equipment used in excavation and heap work. Heavy equipment productivity is calculated based on cycle time in the field and its needs are calculated based on the volume of the weekly plan. After that, an efficient combination of heavy equipment planning is carried out for excavation and heaping work. The method of calculating heavy equipment needs uses a theoretical approach, with cycle time adjustments based on operational conditions in the field. Efficiency analysis and heavy equipment selection are carried out based on the idle time of the smallest heavy equipment. The Optimal cut-fill Pairing and Sequencing (OPS) method is used to create a scheme of excavation and heaping work. The results of the analysis showed that the most efficient combination of heavy equipment used in excavation work of 14,467.66 BCM every week was 4 units of Kobelco PC 200 excavators, 2 units of Kobelco SK 330 excavators, and 10 units of Hino 500 dump trucks. Meanwhile, in the backfill work of 5,423.96 CCM every week, 1 unit of Komatsu D68ESS bulldozer, 1 unit of Sakai SV512TF sheepfoot roller, and 1 unit of Sakai vibro roller SV512TF are needed. This combination is chosen based on the value of the smallest idle time. With proper planning, high work efficiency, operational cost savings, and project completion are achieved according to the set schedule

Author Biography

I Nyoman Dita Pahang Putra, Universitas Pembangunan Nasional “Veteran” Jawa Timur

Civil Engineering

References

Arga Rumbyarso, Y. P. (2023). Perhitungan Produktivitas Peralatan Berat pada Proyek Jalan Tol Semarang-Demak Seksi 1C Km 35+ 400 Sampai dengan 36+ 400. Mechonversio; Mechanical Engineering Journal, 6(2), 34–39. https://ejournal.unsrat.ac.id/index.php/tekno/article/view/22625

Asshiddiqie, H., Khamim, M., & Setiono, J. (2020). Optimasi Penggunaan Alat Berat Pada Pekerjaan Galian Dan Timbunan Proyek Pembangunan Kolam Regulasi Nipa–Nipa Makassar. Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK), 1(2), 71–77. https://doi.org/10.33795/josmrk.v1i2.694

Damayanti, A., Andriani, D., & Hariasih, M. (2023). Analisis Pengembangan Sumber Daya Manusia dan Kemampuan Kerja Karyawan di Era Revolusi Industri 4.0 Terhadap Efisiensi Kerja Karyawan: Peran Mediasi Brainstorming. Jurnal Manajemen STIE Muhammadiyah Palopo, 9(1), 105–123. https://doi.org/10.35906/jurman.v9i1.1532

Djollong, A. F. (2014). Tehnik Pelaksanaan Penelitian Kuantitatif. Istiqra: Jurnal Pendidikan Dan Pemikiran Islam, 2(1), 86–100. https://jurnal.umpar.ac.id/index.php/istiqra/article/view/224/197

Fadri, A., Wijaya, H., & Al-Azhar, A.-A. (2024). Efisiensi Produktivitas Penggunaan Alat Berat Pada Pekerjaan Pembangunan Embung Padang Roco di Kabupaten Dharmasraya. Journal of Applied Engineering Scienties, 7(1), 44–57. https://ft.ekasakti.org/index.php/JAES/index/

Febrianti, D., & Zulyaden, Z. (2017). Analisis Produktivitas Alat Berat Pada Pekerjaan Timbunan. Jurnal Teknik Sipil dan Teknologi Konstruksi, 4(1), 21–30. http://jurnal.utu.ac.id/jtsipil/article/view/586

Gwak, H.-S., Seo, J., & Lee, D.-E. (2018). Optimal Cut-Fill Pairing and Sequencing Method in Earthwork Operation. Automation in Construction, 87, 60–73. https://doi.org/10.1016/j.autcon.2017.12.010

Handayani, E. (2017). Efisiensi Penggunaan Alat Berat Pada Pekerjaan Pembangunan TPA (Tempat Pemprosesan Akhir) Desa AMD Kec. Muara Bulian Kab. Batanghari. Jurnal Ilmiah Universitas Batanghari Jambi, 15(3), 90–95. http://dx.doi.org/10.33087/jiubj.v15i3.154

Hidayat, I. F. (2022). Analisis Kendala-Kendala Pada Proyek Pembangunan Gedung (Studi Kasus Proyek Rumah Sakit ‘Jih’Purwokerto). https://dspace.uii.ac.id/handle/123456789/38743

Peraturan Menteri Pekerjaan Umum No. 11/PRT/M/2013 tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum. (2013). https://peraturan.bpk.go.id/Details/144723/permen-pupr-no-11prtm2013-tahun-2013

Kaprina, A., Winarto, S., & Purnomo, Y. C. S. (2018). Analisa Produktifitas Alat Berat Pada Proyek Pembangunan Gedung Fakultas Syariah Dan Ilmu Hukum Iain Tulungangung. Jurnal Manajemen Teknologi & Teknik Sipil, 1(1), 1–11. https://doi.org/10.30737/jurmateks.v1i1.136

Kausari, A. (2014). Analisis Faktor-Faktor Yang Mempengaruhi Kinerja Mutu Pada Proyek Peningkatan Dan Pembangunan Jalan Kabupaten di Kabupaten Merangin. Abstract of Undergraduate Research, Faculty of Post Graduate, Bung Hatta University, 5(3). https://ejurnal.bunghatta.ac.id/index.php/JPSC2/article/view/3774

Kurniawati, S. A. A., & Putra, I. N. D. P. (2024). Analysis of Heavy Equipment Productivity in the Solo-Yogyakarta-NYIA Kulon Progo Toll Road Construction Project Section 1 Package 1.1. Composite: Journal of Civil Engineering, 3(1), 1–12. https://doi.org/10.26905/cjce.v3i1.12970

Lee, H.-C., Gwak, H.-S., Seo, J., & Lee, D.-E. (2018). Eco-economic excavator configuration method. Automation in Construction, 86, 138–149. https://doi.org/10.1016/j.autcon.2017.11.006

Lee, S. S., Park, S.-i., & Seo, J. (2018). Utilization analysis methodology for fleet telematics of heavy earthwork equipment. Automation in Construction, 92, 59–67. https://doi.org/10.1016/j.autcon.2018.02.035

Novty, T. (2018). Analisis Efisiensi Dump Truck Pada Kombinasi Alat Berat Pekerjaan Galian Dan Timbunan Tanah. https://dspace.uii.ac.id/handle/123456789/5815

Prasetiyo, D., & Priyanto, B. (2023). Analisa Produktivitas Excavator dan Dump Tuck pada Pekerjaan Timbunan Random Proyek Bendungan Jragung. Jurnal Sosial Teknologi, 3(5), 437–443. https://doi.org/10.59188/jurnalsostech.v3i5.735

Prasmoro, A. V., & Hasibuan, S. (2018). Optimasi Kemampuan Produksi Alat Berat Dalam Rangka Produktifitas Dan Keberlanjutan Bisnis Pertambangan Batubara: Studi Kasus Area Pertambangan Kalimantan Timur. Jurnal Operations Excellence: Journal of Applied Industrial Engineering, 10(1), 1–16. https://publikasi.mercubuana.ac.id/index.php/oe/article/view/3145/2203

Prima, G. R., & Hafudiansyah, E. (2022). Produktivitas Alat Berat Pada Pekerjaan Proyek Jalan Tol (Studi Kasus: Ruas Jalan Tol Pematang Panggang – Kayu Agung Seksi 2, Ogan Komering Ilir, Sumatera Selatan). Akselerasi: Jurnal Ilmiah Teknik Sipil, 3(2), 74–81. https://doi.org/10.37058/aks.v3i2.4595

Putra, I. N. D. P. (2025). Analisis Produktivitas Tower Crane pada Pembangunan Gedung Gereja Kemah Tabernakel Pantai Indah Kapuk 2. Ranah Research: Journal of Multidisciplinary Research and Development, 7(3), 1951–1965. https://doi.org/10.38035/rrj.v7i3.1583

Sarmada, M. H., Setiono, J., & Purnomo, F. (2022). Optimasi Alat Berat Pada Pekerjaan Galian Dan Timbunan Proyek Jls Paket 9 STA 0+000 – 3+000. Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK), 3(4), 200–207. https://doi.org/10.33795/josmrk.v3i4.1109

Sherafat, B., Ahn, C. R., Akhavian, R., Behzadan, A. H., Golparvar-Fard, M., Kim, H., Lee, Y.-C., Rashidi, A., & Azar, E. R. (2020). Automated methods for activity recognition of construction workers and equipment: State-of-the-art review. Journal of Construction Engineering and Management, 146(6), 1–19. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001843

Sokop, R. M., Arsjad, T. T., & Malingkas, G. (2018). Analisa Perhitungan Produktivitas Alat Berat Gali-Muat (Excavator) Dan Alat Angkut (Dump Truck) Pada Pekerjaan Pematangan Lahan Perumahan Residence Jordan Sea. Tekno, 16(70). https://doi.org/10.35793/jts.v16i70.22625

Suharyanto, I., & Erfanto, S. (2020). Analisa Penambahan Jam Kerja/Lembur Terhadap Efisiensi Biaya Sewa Alat-Alat Berat Pada Proyek Konstruksi (Studi Kasus Pada Proyek Pemecah Gelombang Glagah Bagian Timur, Kabupaten Kulon Progo, DIY). CivETech, 2(2), 24–36. https://doi.org/10.47200/civetech.v15i2.719

Thayeb, M. A. (2015). Perencanaan Alat Berat Pada Pekerjaan Tanah Proyek Pembangunan Packing Plant PT Semen Indonesia Di Balikpapan. Thesis, Teknik Sipil dan Perencanaan, Institut Teknologi …. https://repository.its.ac.id/62759/3/3112106014-paper.pdf

Downloads

Published

2025-06-13

How to Cite

Hadianto, U., & Putra, I. N. D. P. (2025). Efficiency Analysis of the Combination of Heavy Equipment Use in Excavation and Landfill Work in Road Construction Projects. Physical Sciences, Life Science and Engineering, 2(3), 18. https://doi.org/10.47134/pslse.v2i3.438

Issue

Section

Articles

Similar Articles

You may also start an advanced similarity search for this article.