Abstract

The construction industry often faces challenges such as delays, cost
overruns, and waste. This research aims to improve the efficiency of mall
construction projects using lean construction principles. The methods applied
include borda method for prioritization, pareto method for identification of the
dominant cause of the problem, root cause analysis (RCA) method to analyze the
root of the problem and fishbone diagram to visualize the root cause of the
problem. The case study was conducted on an ongoing mall construction project.
Data were collected through field observations, interviews with relevant parties,
and analysis of project documents. The results show that the application of the
borda method helps identify the factors that have the most influence on project
efficiency, the pareto method focuses attention on 20% of the main causes of
problems that contribute 80% to inefficiency, and the RCA method uncovers the
underlying root causes. Based on the calculation results, it was found that the
most common waste parameter and their sub-parameter were overprocessing
with the sub-parameter “Repair”; overproduction with the sub-parameter
“Design change”; motion with the sub-parameter “No special storage”; defects
with the sub-parameter “Suitability/adequacy of heavy equipment used” waiting
with the sub-parameter “Delay in material arrival at project site”.

References

Aisyah, R. A., Gunawan, K., & Gazali, A. (2023). Lean Construction Through Waste Register Method: A Case Studies Project in Indonesia. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1303–1313. https://doi.org/10.24928/2023/0204

Ali, G., & Nugraheni, F. (2024). Jurnal Teslink : Teknik Sipil dan Lingkungan Waste Material Pekerjaan Struktur Pada Pembangunan Gedung Laboratorium X Menggunakan Analisis Pareto. 6(2), 282–291. https://doi.org/10.52005/teslink.v6i2.403

Allo, R. I. G., & Bhaskara, A. (2022). Waste Material Analysis with The Implementation of Lean Construction. Jurnal Teknik Sipil, 18(2), 343–355. https://doi.org/10.28932/jts.v18i2.4494

Andika, Z., Hasan, M., & Abdullah. (2022). Analisis Faktor-Faktor Penerapan Lean Construction pada Proyek Konstruksi Gedung di Kota Banda Aceh. Jurnal Arsip Rekayasa Sipil Dan Perencanaan, 5(2), 77–86. https://doi.org/10.24815/jarsp.v5i2.25478

Arif, R., & Gunawan, A. (2023). Diagram Pareto dan Diagram Fishbone: Penyebab yang mempengaruhi Keterlambatan Pengadaan Barang di Perusahaan Industri Petrochemicals Cilegon Periode 2020-2022. 7(1), 1–10. https://doi.org/10.48181/jrbmt.v7i1.23411

Coccia, M. (2018). the Fishbone diagram to identify, systematize and analyze the sources of general purpose technologies. https://doi.org/10.1453/jsas.v4i4.1518

Dara, H. M., Raut, A., Adamu, M., Ibrahim, Y. E., & Ingle, P. V. (2024). Reducing non-value added (NVA) activities through lean tools for the precast industry. Heliyon, 10(7). https://doi.org/10.1016/j.heliyon.2024.e29148

Irfanto, R., & Charolin, E. (2024). Implementasi Prinsip Pareto pada Pekerjaan Perbaikan di Proyek Perumahan. Indonesian Journal of Construction Engineering and Sustainable Development (CESD), 7(1), 47–53. https://doi.org/10.25105/cesd.v7i1.20264

Koskela, L., Bølviken, T., & Rooke, J. (2013). Which are the wastes of construction? 905–914. https://www.researchgate.net/publication/290543537_Which_are_the_wastes_of_construction

Lestari, Y. D., & Adhirajasa, A. R. (2024). Implementation of Lean Construction to Reduce Waste with the Value Stream Analysis Tools (VALSAT) Method in the Project Casting Process. Southeast Asian Business Review, 2(2), 92–110. https://doi.org/10.20473/sabr.v2i2.62011

Moretti, F., Vliet, V. L., Bensing, J., Deledda, G., Mazzi, M., Rimondini, M., Zimmermann, C., & Fletcher, I. (2011). A standardized approach to qualitative content analysis of focus group discussions from different countries. Patient Education and Counseling, 82(3), 420–428. https://doi.org/10.1016/j.pec.2011.01.005

Nabilah, V. N., Setiono, & Setyawan, A. (2025). Identifikasi Waste dengan Menerapkan Metode Borda dan Root Cause Analysis pada Proyek Konstruksi. 8(2). https://doi.org/10.20961/jrrs.v8i2.101620

Ning, X., Liu, Y., Miao, J. L., & Li, W. L. (2024). Enhancing the Potentials of the Focus Group Discussion – Engaging Frequently Neglected but Essential Situational Factors for Analyzing Data. International Journal of Qualitative Methods , 23. https://doi.org/10.1177/16094069241306332

Nyumba, T. O., Wilson, K., Derrick, C. J., & Mukherjee, N. (2018). The use of focus group discussion methodology: Insights from two decades of application in conservation. Methods in Ecology and Evolution, 9(1), 20–32. https://doi.org/10.1111/2041-210X.12860

Oktaviani, C. Z. (2018). Kajian Kompleksitas Proyek Konstruksi: Tinjauan Kegiatan Pengadaan Pekerjaan Konstruksi di Indonesia. 13(1). https://doi.org/10.21009/jmenara.v13i1.18033

Pamungkas, T. O., Rifai, M., & Soeryodarundino, K. (2024). Sustainable Civil Building Management Penerapan Lean Construction menggunakan Root Cause Analysis dan Metode Borda dalam mengidentifikasi Waste Non-Value Added Activity (Studi Kasus: Proyek Pembangunan Bendungan Jragung Paket I PT Waskita Karya). And Engineering Journal, 1(2), 1–14. https://doi.org/10.47134/scbmej.v1i2.2981

Prameswari, A., Putra, I. N. D. P., & Widowati, E. D. (2025). Penerapan Prinsip Pareto dalam Evaluasi Alternatif Percepatan Waktu pada Proyek Pembangunan Jalan di Kabupaten Sidoarjo Menggunakan Critical Path Method. In Jurnal Media Konstruksi (Vol. 10, Issue 2). https://doi.org/10.33772/jmk.v10i2.126

Pratistha, I., Mahadewa, A. I. P., & Sugiartawan, P. (2018). Sistem Pendukung Keputusan Kelompok Pemilihan e-commerce/marketplace menggunakan metode profile matching dan Borda. Jurnal Sistem Informasi Dan Komputer Terapan Indonesia (JSIKTI), 1(1), 13–24. https://doi.org/10.33173/jsikti.9

Resti, N. C., Agustin, V. R., & Wahyuni, N. F. (2024). Implementasi Metode Promethee dan Borda Count dalam Seleksi Masuk Karyawan Baru. Journal of Mathematics Education and Science, 7(2), 93–100. https://doi.org/10.32665/james.v7i2.2341

Shabina, S., Amit, T. K., Eram, P., Pranav, K., & Deeksha, G. (2024). Focus Group Discussion: An Emerging Qualitative Tool for Educational Research. International Journal of Research and Review, 11(9), 302–308. https://doi.org/10.52403/ijrr.20240932

Shaqour, E. N. (2022). The impact of adopting lean construction in Egypt: Level of knowledge, application, and benefits. Ain Shams Engineering Journal, 13(2). https://doi.org/10.1016/j.asej.2021.07.005

Wibowo, K., Sugiyarto, & Setiono. (2018). Analisa dan Evaluasi : Akar Penyebab dan Biaya Sisa Material Konstruksi Proyek Pembangunan Kantor Kelurahan di Kota Solo, Sekolah, dan Pasar Menggunakan Root Cause Analysis (RCA) dan Fault Tree Analysis (FTA). 6(2), 303. https://doi.org/10.20961/mateksi.v6i2.36572

Worster, A., Fernandes, C. M. B., Malcolmson, C., Eva, K., & Simpson, D. (2006). Identification of Root Causes for Emergency Diagnostic Imaging Delays at Three Canadian Hospitals. Journal of Emergency Nursing, 32(4), 276–280. https://doi.org/10.1016/j.jen.2006.04.002

Xia, bo, & Chan, A. P. C. (2012). Measuring complexity for building projects: A Delphi study. Engineering, Construction and Architectural Management, 19(1), 7–24. https://doi.org/10.1108/09699981211192544

Yarbrough, A. C., Harris, G. A., Purdy, G. T., & Loyd, N. (2022). Developing Taiichi Ohno’s Mental Model for Waste Identification in Nontraditional Applications. ASME Open Journal of Engineering, 1. https://doi.org/10.1115/1.4054037

Downloads

Published

2025-09-30

How to Cite

Rahadian, R., & Putra, I. (2025). The Application of Lean Construction uses the Borda Method and the Root Cause Analysis Method (Case Study: Sunrise Mall 2 Construction) . Physical Sciences, Life Science and Engineering, 2(4), 18. https://doi.org/10.47134/pslse.v2i4.521

Issue

Section

Articles

Similar Articles

You may also start an advanced similarity search for this article.