Analysis of Potential Work Hazard Risk in the Development of the Road Project Using the HIRARC and FTA Methods
DOI:
https://doi.org/10.47134/pslse.v2i3.417Keywords:
Risk Analysis, HIRARC, Fault Tree AnalysisAbstract
Risk refers to a situation with potential loss or the chance of a loss. Every stage in the construction process inevitably carries potential risk hazards that can threaten the safety of workers, the environment, and the surrounding community. Therefore, a study was conducted to analyse possible risks during mobilising heavy equipment and material vehicles, excavation and embankment work, and blasting work in the X Road construction project. This study employed two methods for risk analysis. The first method involved identifying types of work-related accidents using the HIRARC approach, which included distributing questionnaires to assess each variable's likelihood and severity levels to determine the most significant risk. Then, control measures were applied to the identified risks. After implementing the control measures, a risk reassessment was conducted to assess the level of risk post-control. The identification revealed one dominant variable: heavy equipment overturning from a height. Thus, the analysis continued using the second FTA method to determine the causal factors influencing the risk. The risk was caused by three main factors: human, environmental, and managerial factors, and ten basic events leading to the risk were identified.
References
Adrian, R. BAB 3 MANAJEMEN RISIKO KESELAMATAN. Terapan Keselamatan dan Kesehatan Kerja di Sektor Migas, 37.
AS/NZS. (4630:2004). Risk Management. https://doi.org/0733759041
Bramistra, R. O. (2024). Analisis Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Gedung Bertingkat (Studi Kasus Penggunaan Alat Pelindung Diri Pada Paket Pembangunan Rumah Susun Pondok Pesantren Provinsi Jawa Tengah II TA. 2022) [Universitas Islam Indonesia]. https://dspace.uii.ac.id/handle/123456789/53731
Damayanti, A. F., & Mahbubah, N. A. (2021). Implementasi metode hazard identification risk assessment and risk control guna peningkatan keselamatan dan kesehatan karyawan di PT ABC. Jurnal Serambi Engineering, 6(2). https://doi.org/10.32672/jse.v6i2.2865
Fazis, M., & Tugiah, T. (2022). Perencanaan Proyek dan Penjadwalan Proyek. Jurnal Sosial Teknologi, 2(12), 1365–1377. https://doi.org/10.59188/jurnalsostech.v2i12.517
Hanapi, N. M., Latif, N. H. A., Zaki, J. A., & Kamal, M. M. M. (2024). Integrating HIRARC and Fault Tree Analysis (FTA) for Comprehensive Work Health and Safety Assessment in a Wood Industry Workshop. Semarak International Journal of Public Health and Primary Care, 1(1), 1–15. https://doi.org/10.37934/sijphpc.1.1.115
Husen, A., & Baranyanan, A. S. (2021). Pengaruh pembangunan infrastruktur pelabuhan, infrastruktur jalan dan infrastruktur jembatan terhadap pertumbuhan ekonomi Maluku Utara. Poros Ekonomi, 10(1). https://ejournal.unkhair.ac.id/index.php/porosekonomi/article/view/3669/2366
Jaladri, R. A., Wijayaningtyas, M., Winanda, L. A. R., & Kartika, D. (2023). Analisa Risiko Kecelakaan Kerja Proyek Pembangunan Jalur Lintas Selatan Lot 7 Tambak–Serang Kabupaten Blitar Menggunakan Metode FMEA (Failure Mode And Effect Analysis) Dan Metode Domino. Jurnal Teknik Sipil, 8(1), 30–40. https://doi.org/10.56071/deteksi.v8i1.535
Kececioglu, D. (1991). Reliability Engineering Handbook Volume 1. New York: Prentice Hall. https://ndesoneandik.wordpress.com/wp-content/uploads/2012/04/dimitri-kececioglu-reliability-engineering-handbook-vol-1.pdf
Labombang, M. (2011). Manajemen risiko dalam proyek konstruksi. SMARTek, 9(1). https://www.neliti.com/publications/221524/manajemen-risiko-dalam-proyek-konstruksi
Marsus, B., Indriani, N. K., Darmawan, V., & Fisu, A. A. (2020). Pengaruh panjang infrastruktur jalan terhadap PDRB dan pertumbuhan ekonomi kota Palopo. J. Pembang. Ekon. Dan Keuang. Drh, 1(2016), 1–5. http://repository.umpalopo.ac.id/2166/1/Aldi%20Parintak%20jurnal.pdf
PAKKI. (2025). Kasus Kecelakaan Kerja Meningkat di Awal 2025, Pemerintah Dorong Evaluasi K3 di Sektor Industri. https://sc.pakki.org/berita_detail/kasus-kecelakaan-kerja-meningkat-di-awal-2025-pemerintah-dorong-evaluasi-k3-di-sektor-industri
Purba, A. A., Lestari, F., Rizki, M., & Hamzah, M. L. (2022). Risk Management and Control to Identify Potential Work Accidents in the Production Floor Area. https://doi.org/10.46254/AP03.20220633
Sistem Manajemen Keselamatan dan Kesehatan Kerja - Persyaratan, 1–19 (2007).
Soehatman, R. (2010). Sistem Manajemen Keselamatan & Kesehatan Kerja. Dian Rakyat, Jakarta.
Sufa, M. F., & Astuti, T. R. (2024). Work accident risk analysis using HIRARC and FTA methods (Case study: Suwarno Meubel). E3S Web of Conferences, 517, 15009. https://doi.org/10.1051/e3sconf/202451715009
Triswandana, E. (2020). Penilaian risiko K3 dengan metode HIRARC. UKaRsT, 4(1), 96–108. https://doi.org/10.30737/ukarst.v3i2.
Wardhana, A. (2021). Identifikasi dan Pengukuran Resiko. In Identifikasi dan Pengukuran Resiko (pp. 79–96). https://www.researchgate.net/publication/358138081_Identifikasi_dan_Pengukuran_Resiko
Wicaksono, A., & Yuamita, F. (2022). Pengendalian Kualitas Produksi Sarden Mengunakan Metode Failure Mode And Effect Analysis (FMEA) Dan Fault Tree Analysis (FTA) Untuk Meminimalkan Cacat Kaleng Di PT XYZ. Jurnal Teknologi Dan Manajemen Industri Terapan, 1(3), 145–154. https://doi.org/10.55826/tmit.v1iIII.44
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Liza Manurung, I Nyoman Dita Pahang Putra, Elok Dewi Widowati

This work is licensed under a Creative Commons Attribution 4.0 International License.